Replacing a suction pipe network

A suction network in standard steel, elbows that wear quickly, a risk of perforation and production shutdown. And to make things harder: complex geometry, difficult access and no original drawings.

BMI handled the project from start to finish:

  • On-site 3D scanning: full point-cloud survey of the network, followed by reverse engineering
  • Material choice: Raex® 400 abrasion-resistant steel, for its abrasion resistance and good impact strength
  • Manufacturing: bending, rolling and welding in our workshops, with quality control at every step
  • On-site installation: prevention plan, lifting management and oversize transport

Résultat : un réseau neuf, fiabilisé et monté à l’identique, sans plan d’origine.

latest
news

Rebuilding an impact crusher rotor

Rotor rebuilt, wear-protected and balanced in our workshops.

ABRA-GLIDE hopper for a rubber belt feeder

A BMI hopper lined with modular ABRA-GLIDE wear plates, wear-resistant and anti-clogging, for the industrial minerals sector.

Manufacturing a hopper with modular wear liners

A new hopper protected by removable modular ABRA-FACE 63 liners, fully manufactured in our workshops.